EPC-Errichtung Batteriespeicher Moorburg / Construction of the Battery Storage Moorburg
Originaltitel der Bekanntmachung
Germany – Construction work for power plant – EPC-Errichtung Batteriespeicher Moorburg / Construction of the Battery Storage Moorburg
Opportunity Score
Warum diese Bewertung?
Chance
50 / 100
Komplexität
85 / 100
Risikofaktoren
The entire procedure is subject to receipt of building permit (Section 72 HBauO) and immission control permit (Section...
Award requires approval from the supervisory board of Hamburger Energiewerke. A negative decision leads to cancellation...
Tiefe Portfolioanalyse
Verwendet:
- Description
- Industries & Services
- Capabilities
- Market & Experience
- Certifications
Eckdaten der Ausschreibung
- Öffentlicher Auftraggeber
- Hamburger Energiewerke Energie Hub Moorburg GmbH
- Land
- Deutschland
- CPV
- 45251100 - Construction work for power plant +5 weitere
- Frist
- Jul 20, 2026
Überblick
Moderate opportunityWichtige Fakten
- Works contract
- 1 lot
- EPC turnkey construction of a 200 MW/400-800 MWh battery energy storage system
- Engineering, procurement, construction, commissioning and handover
Vollständige Zusammenfassung anzeigen
EPC turnkey construction of a 200 MW / 400-800 MWh battery energy storage system (BESS) in Hamburg, Germany, including long-term O&M and guarantees. Negotiated procedure with prequalification under German and EU law. Subject to building permit and supervisory board approval.
Risiken
The entire procedure is subject to receipt of building permit (Section 72 HBauO) and immission control permit (Section...
Award requires approval from the supervisory board of Hamburger Energiewerke. A negative decision leads to cancellation...
Analyse kann unvollständig sein
Nur ein Teil der Vergabeunterlagen wurde analysiert. Weitere Anforderungen, Zertifikate oder Einreichungsdokumente können in den übrigen Unterlagen enthalten sein.
Wichtige Anforderungen
Technical
- Procedure subject to building permit (Section 72 HBauO) and supervisory board approval
- Prequalification phase: applications in German or English accepted
Administrative
- Legally binding language is German; final bid must be in German
Auftraggeber
Ort
Hamburg, DEU
Kennung
HRB143733
Tätigkeit
Production, transport or distribution of gas or heat
Lose (1)
LOT-0001
EPC-Errichtung Batteriespeicher Moorburg / Construction of the Battery Storage Moorburg
Design, procurement, construction, commissioning and handover of a turnkey BESS with 200 MW installed power and 400-800 MWh capacity, including grid connection, multi-year O&M, availability and performance guarantees, degradation coverage, extended warranties, and spare parts stock. Performance location: Hamburg, Germany.
Ort
Kategorie
Frist
Zuschlagsdetails
Ziel des Vorhabens ist die Errichtung eines betriebsbereiten Batteriespeichers mit einer installierten Leistung von 200 MW und einer Speicherkapazität zwischen 400 und 800 MWh. Die Anlage ist als kommerziell betriebene Anlage konzipiert und vorrangig auf die Teilnahme am Stromgroßhandel (Day-Ahead und Intraday) sowie an den Regelenergiemärkten ausgerichtet und sie soll einen Beitrag zur Stabilisierung des Stromnetzes leisten, die Integration erneuerbarer Energien unterstützen und Flexibilität im Energiesystem bereitstellen. Die Realisierung erfolgt vollumfänglich über einen EPC-Vertrag. Der Auftragnehmer übernimmt die Gesamtverantwortung für Planung, Beschaffung, Errichtung, Inbetriebnahme und Übergabe der schlüsselfertigen Anlage. Die Liefer- und Leistungsgrenze bildet das Umspannwerk, an das der Speicher angeschlossen wird. Darüber hinaus umfasst die Ausschreibung den geordneten Übergang in den Betrieb sowie langfristige betriebliche Absicherungen. Hierzu zählen insbesondere ein mehrjähriger Betriebs- und Wartungsvertrag (O&M), Verfügbarkeits- und Leistungsgarantien einschließlich der Absicherung der Kapazität über die Lebensdauer (Degradation), erweiterte Gewährleistungs- und Langzeitgarantien sowie eine gesicherte Ersatzteilbevorratung. Ziel ist ein über den gesamten Lebenszyklus zuverlässiger und wirtschaftlicher Anlagenbetrieb. The objective of the project is the construction of an operational battery storage facility with an installed power of 200 MW and a storage capacity between 400 and 800 MWh. The plant is designed as a commercially operated facility and is primarily geared towards participation in the wholesale electricity market (day-ahead and intraday) and the balancing energy markets. It is intended to contribute to the stabilisation of the power grid, support the integration of renewable energies and provide flexibility within the energy system. The project is realised entirely under an EPC contract. The contractor assumes overall responsibility for the design, procurement, construction, commissioning and handover of the turnkey plant. The supply and performance boundary is formed by the substation to which the storage facility is connected. In addition, the tender covers the transition into operation as well as long-term operational safeguards. These include in particular a multi-year operation and maintenance contract (O&M), availability and performance guarantees including safeguarding of the capacity over the service life (degradation), extended warranty and long-term guarantees as well as a secured spare parts stock. The objective is reliable and economic plant operation throughout the entire life cycle.
Zusätzliche CPV-Codes
Hinweis zum Wert
Originale TED-Daten anzeigen
Originale TED-Beschreibung
Ziel des Vorhabens ist die Errichtung eines betriebsbereiten Batteriespeichers mit einer installierten Leistung von 200 MW und einer Speicherkapazität zwischen 400 und 800 MWh. Die Anlage ist als kommerziell betriebene Anlage konzipiert und vorrangig auf die Teilnahme am Stromgroßhandel (Day-Ahead und Intraday) sowie an den Regelenergiemärkten ausgerichtet und sie soll einen Beitrag zur Stabilisierung des Stromnetzes leisten, die Integration erneuerbarer Energien unterstützen und Flexibilität im Energiesystem bereitstellen. Die Realisierung erfolgt vollumfänglich über einen EPC-Vertrag. Der Auftragnehmer übernimmt die Gesamtverantwortung für Planung, Beschaffung, Errichtung, Inbetriebnahme und Übergabe der schlüsselfertigen Anlage. Die Liefer- und Leistungsgrenze bildet das Umspannwerk, an das der Speicher angeschlossen wird. Darüber hinaus umfasst die Ausschreibung den geordneten Übergang in den Betrieb sowie langfristige betriebliche Absicherungen. Hierzu zählen insbesondere ein mehrjähriger Betriebs- und Wartungsvertrag (O&M), Verfügbarkeits- und Leistungsgarantien einschließlich der Absicherung der Kapazität über die Lebensdauer (Degradation), erweiterte Gewährleistungs- und Langzeitgarantien sowie eine gesicherte Ersatzteilbevorratung. Ziel ist ein über den gesamten Lebenszyklus zuverlässiger und wirtschaftlicher Anlagenbetrieb. The objective of the project is the construction of an operational battery storage facility with an installed power of 200 MW and a storage capacity between 400 and 800 MWh. The plant is designed as a commercially operated facility and is primarily geared towards participation in the wholesale electricity market (day-ahead and intraday) and the balancing energy markets. It is intended to contribute to the stabilisation of the power grid, support the integration of renewable energies and provide flexibility within the energy system. The project is realised entirely under an EPC contract. The contractor assumes overall responsibility for the design, procurement, construction, commissioning and handover of the turnkey plant. The supply and performance boundary is formed by the substation to which the storage facility is connected. In addition, the tender covers the transition into operation as well as long-term operational safeguards. These include in particular a multi-year operation and maintenance contract (O&M), availability and performance guarantees including safeguarding of the capacity over the service life (degradation), extended warranty and long-term guarantees as well as a secured spare parts stock. The objective is reliable and economic plant operation throughout the entire life cycle.
Vergabedetails
- Veröffentlichungsdatum
- 23 Jun 2026
- Sprachen
- German
Referenzmetadaten
- Rechtsgrundlage
- 32014L0025
Referenz-IDs
- Ausschreibungs-ID
- 430708-2026
Dokumente (2)
Ähnliche Ausschreibungen
Denmark – Servers – 02.03 Servere og storage (DIS)
France – Repair and maintenance services – Référencement de sociétés pour des prestations de service et de fourniture dédiées aux vélos et batteries dans le cadre d'une utilisation durable
France – Repair and maintenance services – Système d'acquisition dynamique portant sur le référencement de sociétés pour le reconditionnement de vélos et/ou de batteries vélos, ainsi que l'achat de batteries vélos reconditionnées
Lithuania – Electrical fitting work – ELEKTROS ENERGIJOS KAUPIMO ĮRENGINIAI, ĮSKAITANT PROJEKTAVIMO PASLAUGAS IR ĮRENGIMO DARBUS
Finland – Batteries – Kiinteistöakkujen ja muiden energiavarastoratkaisujen DPS
Norway – Construction work – Magnet Joint Qualification System (Magnet JQS) - Notification of qualification system
Opportunity Score
Warum diese Bewertung?
Chance
50 / 100
Komplexität
85 / 100
Risikofaktoren
The entire procedure is subject to receipt of building permit (Section 72 HBauO) and immission control permit (Section...
Award requires approval from the supervisory board of Hamburger Energiewerke. A negative decision leads to cancellation...
Tiefe Portfolioanalyse
Verwendet:
- Description
- Industries & Services
- Capabilities
- Market & Experience
- Certifications