Tenderwize
Zurück zur Suche

Poland – Roadworks – Budowa obwodnicy Łagowa w ciągu DW756 – etap I

Województwo Świętokrzyskie - Świętokrzyski Zarząd Dróg Wojewódzkich w KielcachKielce, PolandNot disclosed35 days leftopen
65

Opportunity Score

Confidence: 55%

Complexity: high

35 days

Deadline

works

Contract

SME suitable

Deep Portfolio Analysis

  • Company fit score
  • Missing certificates
  • Eligibility blockers
  • Bid / No-Bid recommendation
Create account for AI analysis

AI Analysis Summary

Moderate opportunity

This tender is for the construction of the Łagów bypass along DW756 road (Stage I) in Poland. The project involves building approximately 1.5 km of voivodeship road, including two bridges (139 m and 104 m), a bicycle path, and necessary road infrastructure. The contract is a single lot (no division into parts) with a 22-month duration. The procedure is an open tender under Polish Public Procurement Law. Estimated value is not disclosed. Award criteria: price 80%, warranty period 20%. Submission deadline: 2026-07-24 10:00 CEST. The buyer is the Świętokrzyskie Voivodeship - Świętokrzyski Board of Voivodeship Roads in Kielce.

Strengths

Documents available

Open procedure

35 days left

Analysis may be incomplete

Only part of the procurement documentation was analyzed. Additional eligibility requirements, certificates, or submission documents may exist in the remaining tender documentation.

Key Requirements

  • Tender must be submitted in Polish language via electronic platform Logintrade
  • Bid bond (wadium) of 1,000,000 PLN required
  • Performance security of 5% of total gross price required from the winning bidder

Award Criteria

Cena

Cena 80%

Type: Price

Buyer

Name

Województwo Świętokrzyskie - Świętokrzyski Zarząd Dróg Wojewódzkich w Kielcach

Location

Kielce, POL

Buyer profile

Open profile

Identifier

9591506120

Lots (1)

#LOT-0001Budowa obwodnicy Łagowa w ciągu DW756 – etap I

Construction of approximately 1.5 km of voivodeship road No. 756, including two bridges (over Łagowica river and Sosna stream), a bicycle path, and road equipment. Scope includes road construction, bridges, and infrastructure. Duration: 22 months.

45233140, 45221000, 45230000, 45220000POL

Procurement Details

Publication

16 Jun 2026

Deadline

24 Jul 2026, 08:00

Procedure

open

Contract

works

Duration

22 MONTH

Language

POL

Publication #

415336-2026

Classification

Performance: Poland

Documents (2)

Similar tenders