Czechia – Construction work – „Zkapacitnění výtlačného potrubí pitné vody z ÚV Troubky do VDJ Polkovice, Etapa km 4,702 – VDJ Polkovice"

Vodovody a kanalizace Přerov, a.s.Přerov - Přerov I-Město, Czech RepublicCZK 111,586,192 / ~EUR 4,621,31224 days leftopen
60

Opportunity Score

Confidence: 70%

Complexity: medium

24 days

Deadline

works

Contract

Deep Portfolio Analysis

  • Company fit score
  • Missing certificates
  • Eligibility blockers
  • Bid / No-Bid recommendation
Create account for AI analysis

AI Analysis Summary

Moderate opportunity

This tender (publication number 412650-2026) is issued by Vodovody a kanalizace Přerov, a.s. for construction works to increase the capacity of a drinking water pipeline from Troubky water treatment plant to Polkovice reservoir in Czechia. The project includes trenchless pipe replacement (Berstlining), pump upgrades, and temporary water supply. The estimated value is 111,586,192 CZK. The deadline for tender submission is 2026-07-13T07:00:00Z. The procedure is open, electronic submission required, and documents are available at https://zakazky.vakpr.cz/. Selection and award criteria are not provided in the notice; they are referenced to procurement documents.

Strengths

Documents available

Open procedure

Medium complexity

Analysis may be incomplete

Only part of the procurement documentation was analyzed. Additional eligibility requirements, certificates, or submission documents may exist in the remaining tender documentation.

Key Requirements

  • Use of ductile iron pipes DN250 with specific coatings and joints as per ČSN EN 545:2015
  • Berstlining method for pipe replacement with strict pulling force limit of 375 kN
  • Temporary water supply (dry pipeline) must be maintained throughout construction

Buyer

Name

Vodovody a kanalizace Přerov, a.s.

Location

Přerov - Přerov I-Město, CZE

Buyer profile

Open profile

Identifier

47674521

Lots (1)

#LOT-0001„Zkapacitnění výtlačného potrubí pitné vody z ÚV Troubky do VDJ Polkovice, Etapa km 4,702 – VDJ Polkovice"

Upgrade of water pipeline using trenchless technology (Berstlining) for approx. 6,293 m, replacement of pumps, and temporary water supply. Detailed scope includes specific material requirements (ductile iron DN250, specific coatings), open-cut in a short section (70 m), and emergency/flood planning.

CZK 111,586,19245000000, 45232150, 51100000, 45231112, 45231110, 45231300CZE

Procurement Details

Publication

15 Jun 2026

Deadline

13 Jul 2026, 07:00

Procedure

open

Contract

works

Duration

420 DAY

Language

CES

Publication #

412650-2026

Classification

Performance: Czech Republic