Slovakia – Construction work – Rekonštrukcia mosta ev. č. R1-018 Váhovce, ľavý most

Národná diaľničná spoločnosť, a.s.Bratislava, SlovakiaEUR 6,859,518 / ~EUR 6,859,51830 days leftopen
65

Opportunity Score

Confidence: 50%

Complexity: medium

30 days

Deadline

works

Contract

SME suitable

Deep Portfolio Analysis

  • Company fit score
  • Missing certificates
  • Eligibility blockers
  • Bid / No-Bid recommendation
Create account for AI analysis

AI Analysis Summary

Moderate opportunity

This tender, published by Národná diaľničná spoločnosť, a.s. (Slovakia), concerns the reconstruction of bridge R1-018 over the Váh river and Králová water reservoir near Váhovce. The contract is a single lot (LOT-0001) for construction works, with an estimated value of €6,859,517.78 (excl. VAT). The procedure is open, with electronic submission required. The deadline for tenders is 15 July 2026 at 07:00 CEST. Award is based on the lowest total price. The procurement documents are available but were not fully analyzed.

Strengths

Documents available

Open procedure

Medium complexity

Analysis may be incomplete

Only part of the procurement documentation was analyzed. Additional eligibility requirements, certificates, or submission documents may exist in the remaining tender documentation.

Key Requirements

  • Open procedure
  • Electronic submission required via IS JOSEPHINE
  • Tenders must be submitted in Slovak (SLK) or Czech (CES)

Award Criteria

Najnižšia celková cena za uskutočnenie celého predmetu zákazky v EUR bez DPH.

Ponuky uchádzačov sa budú vyhodnocovať v súlade s § 44 ods. 3 písm. c) Zákona, a teda na základe najnižšej ceny za celý predmet zákazky v EUR bez DPH.

Type: Price

Buyer

Name

Národná diaľničná spoločnosť, a.s.

Location

Bratislava, SVK

Buyer profile

Open profile

Identifier

35919001

Lots (1)

#LOT-0001Rekonštrukcia mosta ev. č. R1-018 Váhovce, ľavý most

Reconstruction of the left bridge R1-018 over the Váh river and Králová water reservoir. Works include general construction (CPV 45000000), bridge construction (45221119), concrete work (45262300), steel reinforcement (45262310), and plastering (45410000). Duration: 193 days. The main lot is the only fully described lot; additional lot entries in structured data appear to be duplicates or incomplete and are not treated as separate lots.

EUR 6,859,517.7845000000, 45221119, 45262300, 45262310, 45410000SVK

Procurement Details

Publication

11 Jun 2026

Deadline

15 Jul 2026, 07:00

Procedure

open

Contract

works

Duration

193 DAY

Language

SLK, CES

Publication #

405180-2026

Classification

Performance: Slovakia