Switzerland – Refuse-incineration plant construction work – Ersatz Verbrennungslinie 2 - ET02 Schaltgerätekombinationen (SGK)
Opportunity Score
Confidence: 30%
Complexity: medium
86 days
Deadline
works
Contract
Deep Portfolio Analysis
- Company fit score
- Missing certificates
- Eligibility blockers
- Bid / No-Bid recommendation
AI Analysis Summary
Swiss tender for the supply, installation, wiring, testing, and commissioning of various switchgear combinations (SGK) for the replacement of incineration line 2 (Ersatz Verbrennungslinie 2). The project is located in Winterthur, Switzerland. The procedure is open with a single lot. The documentation provided is limited to the notice; no procurement documents were analyzed.
Strengths
Open procedure
Medium complexity
86 days left
Risks
No procurement documents available
Analysis may be incomplete
Only part of the procurement documentation was analyzed. Additional eligibility requirements, certificates, or submission documents may exist in the remaining tender documentation.
Key Requirements
- Tenders must be submitted by 9 September 2026 at 14:00 local time (12:00 UTC).
- Submission is electronic only via devisio.ch.
- Language of tender: German (DEU).
Buyer
Name
INGE CSD / I.C.E. / IBG
Location
Zürich, CHE
Identifier
9990773f-794f-4a88-99bd-3dc996b8c453
Lots (1)
Delivery, installation, wiring, testing, and commissioning of all switchgear combinations including low-voltage main distribution (NSHV), motor control centers (MCC), frequency converters (FU), uninterruptible power supply (USV), instrumentation and control cabinets (MSR), peripheral distribution boxes (PVK), building services NSHV/UV, and decentralized lighting UV. Also includes creation of electrical schematic documentation.
Procurement Details
Publication
11 Jun 2026
Deadline
09 Sep 2026, 12:00
Procedure
open
Contract
works
Language
DEU
Publication #
405040-2026
Classification
Performance: Switzerland
Documents (1)
Opportunity Score
Confidence: 30%
Complexity: medium
86 days
Deadline
works
Contract
Deep Portfolio Analysis
- Company fit score
- Missing certificates
- Eligibility blockers
- Bid / No-Bid recommendation