Construction, Operation and Maintenance of Eleven Offshore Wind Farms
Originaltitel der Bekanntmachung
France – Wind-power installation works – Procédure d’appel d’offres n°1/2026 portant sur onze projets d’installations éoliennes de production d’électricité en mer situés au large de la Normandie, au large de la Bretagne, en Sud-Atlantique et en mer Méditerranée
Opportunity Score
Warum diese Bewertung?
Chance
60 / 100
Komplexität
95 / 100
Risikofaktoren
No estimated value or budget provided; potential for high upfront investment and uncertain revenue.
Tender governed by French national law; changes in energy policy may affect contract terms.
Submission deadline in 6 days
Tiefe Portfolioanalyse
Verwendet:
- Description
- Industries & Services
- Capabilities
- Market & Experience
- Certifications
Eckdaten der Ausschreibung
- Öffentlicher Auftraggeber
- Ministère de l'Économie, des Finances et de la Souveraineté industrielle, énergétique et numérique
- Land
- Frankreich
- CPV
- 45251160 - Wind-power installation works
- Frist
- Oct 12, 2026
Überblick
Moderate opportunityWichtige Fakten
- Works contract
- 1 lot
- Duration 25 YEAR
- Construction, operation, and maintenance of 11 offshore wind farms (fixed and floating) in French waters.
- Projects located in Normandy, Brittany, South Atlantic, and Mediterranean.
Vollständige Zusammenfassung anzeigen
French tender for the construction and operation of 11 offshore wind farms (fixed and floating) off the coasts of Normandy, Brittany, South Atlantic, and Mediterranean. The procedure is governed by the French Energy Code. The winning bidders will sign a contract for a feed-in premium. The structured data indicates a single lot covering all projects, and the notice is for works with a 25-year duration. No estimated value is provided. The submission deadline is 2026-10-12T10:00:00 (with a possible fallback to 12:00 CET). The tender documents are available on the CRE website and are to be downloaded. Award criteria are based on economic/financial value, industrial, environmental, social, and territorial development aspects, with detailed weighting specified in the cahier des charges only. This analysis is based solely on the TED notice and structured data; the actual procurement documents were not analyzed.
Risiken
No estimated value or budget provided; potential for high upfront investment and uncertain revenue.
Tender governed by French national law; changes in energy policy may affect contract terms.
Submission deadline in 6 days
Analyse kann unvollständig sein
Nur ein Teil der Vergabeunterlagen wurde analysiert. Weitere Anforderungen, Zertifikate oder Einreichungsdokumente können in den übrigen Unterlagen enthalten sein.
Wichtige Anforderungen
Technical
- Must be established in an EU member state or a state covered by international agreements.
- Compliance with French Energy Code (Articles L.311-10 et seq. and R.311-13 et seq.).
- Formation of a project company as per cahier des charges.
Anforderungen können unvollständig sein.
Zuschlagskriterien
Lot 1
Auftraggeber
Name
Ministère de l'Économie, des Finances et de la Souveraineté industrielle, énergétique et numérique
Ort
Paris, FRA
Kennung
11002001300097
Tätigkeit
Defence
Lose (1)
LOT-0001
Construction, Operation and Maintenance of Eleven Offshore Wind Farms
Construction, operation, and maintenance of 11 offshore wind farms: (i) three fixed-bottom farms off Normandy (1,350-1,450 MW each); (ii) one floating farm off North Brittany (1,150-1,300 MW); (iii) one floating farm off South Brittany (400-550 MW); (iv) one fixed-bottom farm in South Atlantic (1,150-1,300 MW); (v) five floating farms in Mediterranean (450-550 MW, 450-550 MW, 500-650 MW, 500-650 MW, 1,050-1,200 MW). The maximum number of lots per candidate is determined in the cahier des charges.
Ort
Dauer
Kategorie
Zuschlagskriterien
Frist
Zuschlagsdetails
Economic and financial value, industrial, environmental, social, and territorial development issues. Detailed weighting in cahier des charges.
Hinweis zum Wert
Originale TED-Daten anzeigen
Originaler Los-Titel
Construction, exploitation et maintenance de onze parcs d’éoliennes en mer situés au large de la Normandie, au large de la Bretagne, en Sud-Atlantique et en mer Méditerranée
Originale TED-Beschreibung
Construction, exploitation et maintenance de onze parcs éoliens en mer : (i) un parc posé situé au large de la Normandie, d’une puissance comprise entre 1 350 et 1 450 MW ; (ii) un deuxième parc posé situé au large de la Normandie, d’une puissance comprise entre 1 350 et 1 450 MW ; (iii) un troisième parc posé situé au large de la Normandie, d’une puissance comprise entre 1 350 et 1 450 MW ; (iv) un parc flottant situé au large du Nord de la Bretagne, d’une puissance comprise entre 1 150 et 1 300 MW ; (v) un parc flottant situé au large du Sud de la Bretagne, d’une puissance comprise entre 400 et 550 MW (vi) un parc posé situé en Sud-Atlantique, d’une puissance comprise entre 1 150 et 1300 MW ; (vii) un parc flottant en Méditerranée, d’une puissance comprise entre 450 et 550 MW ; (viii) un deuxième parc flottant en Méditerranée, d’une puissance comprise entre 450 et 550 MW ; (ix) un troisième parc flottant en Méditerranée, d’une puissance comprise entre 500 et 650 MW ; (x) un quatrième parc flottant en Méditerranée, d’une puissance comprise entre 500 et 650 MW ; et (xi) un cinquième parc flottant en Méditerranée, d’une puissance comprise entre 1 050 et 1 200 MW. Conformément à l’article R. 311-13, 2° bis, du code de l’énergie, le cahier des charges publié sur le site de la Commission de régulation de l’énergie détermine le nombre maximal de projets pouvant être attribués à un même candidat.
Vergabedetails
- Veröffentlichungsdatum
- 10 Jun 2026
- Sprachen
- French
Referenzmetadaten
- Rechtsgrundlage
- other
Referenz-IDs
- Ausschreibungs-ID
- 402287-2026
Dokumente (1)
Ähnliche Ausschreibungen
Opportunity Score
Warum diese Bewertung?
Chance
60 / 100
Komplexität
95 / 100
Risikofaktoren
No estimated value or budget provided; potential for high upfront investment and uncertain revenue.
Tender governed by French national law; changes in energy policy may affect contract terms.
Submission deadline in 6 days