Romania – Construction work for electricity power lines – Proiectare si executie a lucrarilor de modernizare bransamente prin montare FDCP / BMP in instalatiile DEO din zona de activitate aferente judetului Dolj pentru o perioada de 36 luni
Opportunity Score
Confidence: 45%
Complexity: medium
7 days
Deadline
works
Contract
Deep Portfolio Analysis
- Company fit score
- Missing certificates
- Eligibility blockers
- Bid / No-Bid recommendation
AI Analysis Summary
Framework agreement for design and execution of modernization of electrical connections (FDCP/BMP) in Dolj County, Romania, for 36 months. Negotiated procedure with call for competition. Estimated value RON 21.77M (including RON 5M materials provided by buyer). Submission deadline 26 June 2026. Only notice data analyzed; procurement documents not available.
Strengths
Documents available
Medium complexity
7 days left
Risks
Submission deadline in 7 days
Analysis may be incomplete
Only part of the procurement documentation was analyzed. Additional eligibility requirements, certificates, or submission documents may exist in the remaining tender documentation.
Key Requirements
- Registration as a legal entity (trade register certificate for Romanian firms; equivalent for foreign firms).
- Adequate professional capacity to perform works (object of activity must match procurement scope).
- Submission of DUAE (European Single Procurement Document) for qualification.
Award Criteria
Pretul ofertei
Punctajul se acorda astfel: a) Pentru cel mai scazut dintre preturi se acorda punctajul maxim alocat; b) Pentru celelalte preturi ofertate punctajul P(n) se calculeaza proportional, astfel: P(n) = (Pret minim ofertat / Pret n) x punctaj maxim alocat.
| Criterion | Type |
|---|---|
Pretul ofertei Punctajul se acorda astfel: a) Pentru cel mai scazut dintre preturi se acorda punctajul maxim alocat; b) Pentru celelalte preturi ofertate punctajul P(n) se calculeaza proportional, astfel: P(n) = (Pret minim ofertat / Pret n) x punctaj maxim alocat. | Price |
Buyer
Name
DISTRIBUTIE ENERGIE OLTENIA S.A.
Location
Craiova, ROU
Website
Buyer profile
Identifier
14491102
Lots (3)
Design (PTE) and execution of modernization works for electrical connections in Dolj County. Includes GIS and DTAC. Buyer provides materials worth RON 5M. Contract subcontracted monthly or as needed. Framework maximum value RON 21,771,852.92.
Incomplete lot data: only award criteria (quality) available. No further details.
Incomplete lot data: only selection criteria source reference (epo-procurement-document) available.
Procurement Details
Publication
09 Jun 2026
Deadline
26 Jun 2026, 07:00
Procedure
open
Contract
works
Duration
36 MONTH
Language
RON
Publication #
398969-2026
Classification
Performance: Romania
Documents (2)
Similar tenders
Romania – Road-maintenance works – Întreţinere drumuri asfaltate – acord cadru - 4 ani - Sector Criș.
Romania – Roadworks – Elaborare documentatie tehnica pentru obtinerea autorizatiei de construire (DTAC), proiect tehnic pentru executia lucrarilor (PT), asistenta tehnica din partea proiectantului pe perioada executarii lucrarilor si executie lucrari pentru obiectivul de investitii: Modernizare strada Apateului – tronson cu nr.28-30 - Conform C.F. NR. 207356, Municipiul Oradea, Judetul Bihor
Romania – Parking lot construction work – lucrări de execuție pentru investiția ”construire parcare în regim P+2E pentru parcare Long Term P5”
Romania – Park-and-ride facility construction work – Executie lucrari in cadrul proiectului ,,Terminal multimodal si baza Park & Ride"
Romania – Construction work for water and sewage pipelines – MS-CL-R02-Lot 01VN Lucrări pe sistemele de alimentare cu apă Vărgata, Miercurea Nirajului MS-CL-R02-Lot 02VN Lucrări pe sistemele de alimentare cu apa Gălești, Păsăreni MS-CL-R02-Lot 03VN Lucrări pe ssstemele de alimentare cu apă Gh Doja, Acățari MS-CL-R02-Lot 04TN Lucrări pe sistemele de alimentare cu apă Mica,Bahnea MS-CL-R02-Lot 05CS Lucrări pe sistemele de alimentare cu apă Cristuru Secuiesc
Romania – Construction work for highways, roads – PROIECTARE SI EXECUTIE “Autostrada Craiova – Filiasi si Drum Expres Filiasi – Targu Jiu – Lotul 4”
Opportunity Score
Confidence: 45%
Complexity: medium
7 days
Deadline
works
Contract
Deep Portfolio Analysis
- Company fit score
- Missing certificates
- Eligibility blockers
- Bid / No-Bid recommendation