Poland – Tramway works – Wykonanie prac w formule „wybuduj” dla zadania pn.: „Budowa torowiska tramwajowego w Sosnowcu w ul. 11 Listopada na odcinku od ronda na skrzyżowaniu ulic 11 Listopada i Marszałka Edwarda Rydza-Śmigłego do skrzyżowania ul. 11 Listopada i Generała Władysława Andersa
Opportunity Score
Confidence: 40%
Complexity: high
10 days
Deadline
works
Contract
Deep Portfolio Analysis
- Company fit score
- Missing certificates
- Eligibility blockers
- Bid / No-Bid recommendation
AI Analysis Summary
This tender by Tramwaje Śląskie S.A. (Poland) concerns the construction of a new tram track in Sosnowiec (approx. 3.04 km of new track and 0.91 km of existing track reconstruction), including traction network, substation, and stops. The contract is EU-funded, using an open procedure with a single lot. The submission deadline is 25 June 2026, with a 24-month execution period. Award criteria are 80% price and 20% warranty extension. The estimated value is not disclosed, but the notice indicates it exceeds €20 million. Key requirements include a minimum financial capacity of PLN 15 million and proven experience in similar tram track and traction network works. The tender documents are available online but were not analyzed in detail.
Strengths
Documents available
Open procedure
10 days left
Risks
Submission deadline in 10 days
Analysis may be incomplete
Only part of the procurement documentation was analyzed. Additional eligibility requirements, certificates, or submission documents may exist in the remaining tender documentation.
Key Requirements
- Financial capacity: minimum PLN 15,000,000 (own funds or credit line)
- Technical experience: at least 2 similar tram track construction/renovation works (min. 500 m each)
- Technical experience: at least 2 similar traction network construction/renovation works (min. 500 m each)
Buyer
Name
Tramwaje Śląskie S.A.
Location
Katowice, POL
Website
Identifier
6340125637
Lots (2)
Construction of a new tram line in Sosnowiec, including double-track track, drainage, traction network, traction substation, passenger platforms, and relocation of colliding infrastructure. New track length ~3.04 km, existing reconstruction ~0.91 km. Duration 24 months.
Incomplete lot data provided in structured data; only award criteria (quality) and no deadline or description. Likely an artifact.
Procurement Details
Publication
08 Jun 2026
Deadline
25 Jun 2026, 10:45
Procedure
open
Contract
works
Duration
24 MONTH
Language
POL
Publication #
393538-2026
Classification
Performance: Poland
Documents (2)
Opportunity Score
Confidence: 40%
Complexity: high
10 days
Deadline
works
Contract
Deep Portfolio Analysis
- Company fit score
- Missing certificates
- Eligibility blockers
- Bid / No-Bid recommendation