Turin Metro Line 2 - Rebaudengo-Politecnico civil works and installations
Originaltitel der Bekanntmachung
Italy – Underground railway works – Appalto 1/2026: PROCEDURA DI GARA APERTA, AI SENSI DEGLI ARTT. 44, 71 E 153, COMMA 1 LETT. A) DEL D.LGS. N. 36/2023 PER L'AFFIDAMENTO DELL'APPALTO INTEGRATO DELLE OPERE CIVILI E DEGLI IMPIANTI NON DI SISTEMA DELLA LINEA 2 DELLA METROPOLITANA DI TORINO - TRATTA "REBAUDENGO-POLITECNICO", SUDDIVISO IN DUE LOTTI PRESTAZIONALI. CUP C71F20000020005
Opportunity Score
Warum diese Bewertung?
Chance
65 / 100
Komplexität
85 / 100
Risikofaktoren
Essential procurement documents (Disciplinare di Gara, technical specs) were not analyzed. Key details may be missing.
Large-scale metro construction with complex technical requirements and long durations (up to 2686 days).
Tiefe Portfolioanalyse
Verwendet:
- Description
- Industries & Services
- Capabilities
- Market & Experience
- Certifications
Eckdaten der Ausschreibung
- Öffentlicher Auftraggeber
- COMMISSARIO STRAORDINARIO PER REALIZZAZIONE DELL'INTERVENTO - LINEA 2 DELLA METROPOLITANA DELLA CITTA' TORINO
- Land
- Italien
- CPV
- 45234122 - Underground railway works
- Frist
- Jul 21, 2026
- Geschätzter Wert
- EUR 1481.3M
Überblick
Moderate opportunityWichtige Fakten
- EUR 1481.3M estimated value
- Works contract
- 2 lots
- Integrated civil works and non-system installations for Turin Metro Line 2, section Rebaudengo-Politecnico.
- Two performance lots: Lot 1 (Rebaudengo-Croce Rossa) and Lot 2 (Croce Rossa-Porta Nuova and Porta Nuova-Politecnico, with optional part).
Vollständige Zusammenfassung anzeigen
Open tender for the integrated civil works and non-system installations of Turin Metro Line 2, Section "Rebaudengo-Politecnico", divided into two performance lots. The buyer is the Special Commissioner for the intervention. The total estimated value is €1,481,317,913.29, with Lot 1 worth €447,926,510.42 (construction lot 1A) and Lot 2 worth €1,033,391,402.87 (construction lot 1B base part and optional lot 2C). The tender procedure is open, with electronic submission required by 31 July 2026. Award is based on quality criteria only. The procurement documents are available online but were not analyzed.
Risiken
Essential procurement documents (Disciplinare di Gara, technical specs) were not analyzed. Key details may be missing.
Large-scale metro construction with complex technical requirements and long durations (up to 2686 days).
Analyse kann unvollständig sein
Nur ein Teil der Vergabeunterlagen wurde analysiert. Weitere Anforderungen, Zertifikate oder Einreichungsdokumente können in den übrigen Unterlagen enthalten sein.
Wichtige Anforderungen
Technical
- Open procedure pursuant to Italian Legislative Decree 36/2023.
Administrative
- Electronic submission via Portal öffnen
- Submission in Italian language only.
Anforderungen können unvollständig sein.
Zuschlagskriterien
Lot 1
Lot 2
Auftraggeber
Ort
TORINO, ITA
Kennung
97901440012
Tätigkeit
Urban railway, tramway, trolleybus or bus services
Lose (2)
LOT-0001
LOTTO 1 - “REBAUDENGO – CROCE ROSSA” - (LOTTO COSTRUTTIVO 1A)
Lot 1 covers the section from Rebaudengo to Croce Rossa (construction lot 1A). It includes civil works and non-system installations. Duration 1875 days.
EUR 1.5B
Geschätzter Wert
Ort
Dauer
Kategorie
Zuschlagskriterien
Frist
Zuschlagsdetails
A - PROFESSIONALITA’ E COMPETENZE DEL GRUPPO DI LAVORO (PROGETTAZIONE ED ESECUZIONE)
B- INGEGNERIA E COSTRUZIONE
C - CANTIERIZZAZIONI E AMBIENTE
D - MONITORAGGIO GEOTECNICO E STRUTTURALE
E - GESTIONE DEL RISCHIO
F - OFFERTA GESTIONE INFORMATIVA
G - ESTENSIONE GARANZIE
Hinweis zum Wert
Originale TED-Daten anzeigen
Originaler Los-Titel
LOTTO 1 - “REBAUDENGO – CROCE ROSSA” - (LOTTO COSTRUTTIVO 1A)
Originale TED-Beschreibung
Si veda Disciplinare di Gara par. 3
LOT-0002
LOTTO 2 – “CROCE ROSSA – PORTA NUOVA” - (LOTTO COSTRUTTIVO 1B – PARTE BASE) - “PORTA NUOVA – POLITECNICO” (LOTTO COSTRUTTIVO 2C – PARTE OPZIONALE)
Lot 2 covers the section from Croce Rossa to Porta Nuova (construction lot 1B base part) and from Porta Nuova to Politecnico (construction lot 2C optional part). Includes civil works and non-system installations. Duration 2686 days.
EUR 1.5B
Geschätzter Wert
Ort
Dauer
Kategorie
Zuschlagskriterien
Frist
Zuschlagsdetails
A - PROFESSIONALITA’ E COMPETENZE DEL GRUPPO DI LAVORO (PROGETTAZIONE ED ESECUZIONE)
B- INGEGNERIA E COSTRUZIONE
C - CANTIERIZZAZIONI E AMBIENTE
D - MONITORAGGIO GEOTECNICO E STRUTTURALE
E - GESTIONE DEL RISCHIO
F - OFFERTA GESTIONE INFORMATIVA
G - ESTENSIONE GARANZIE
Hinweis zum Wert
Originale TED-Daten anzeigen
Originaler Los-Titel
LOTTO 2 – “CROCE ROSSA – PORTA NUOVA” - (LOTTO COSTRUTTIVO 1B – PARTE BASE) - “PORTA NUOVA – POLITECNICO” (LOTTO COSTRUTTIVO 2C – PARTE OPZIONALE)
Originale TED-Beschreibung
Si veda Disciplinare di Gara par. 3Si precisa che la voce "Lavori e Progettazione" qui indicata ricomprende gli importi del Lotto 1B e del Lotto 2C
Vergabedetails
- Veröffentlichungsdatum
- 07 Jun 2026
- Sprachen
- Italian
Referenzmetadaten
- Rechtsgrundlage
- 32014L0025
Referenz-IDs
- Ausschreibungs-ID
- 390698-2026
Dokumente (2)
Ähnliche Ausschreibungen
Opportunity Score
Warum diese Bewertung?
Chance
65 / 100
Komplexität
85 / 100
Risikofaktoren
Essential procurement documents (Disciplinare di Gara, technical specs) were not analyzed. Key details may be missing.
Large-scale metro construction with complex technical requirements and long durations (up to 2686 days).
Tiefe Portfolioanalyse
Verwendet:
- Description
- Industries & Services
- Capabilities
- Market & Experience
- Certifications