Germany – Railway construction works – ESTW Gießen-Nidda TK, 2. Baustufe (Strecke 3701 von km 21,760 bis 35,000)
Opportunity Score
Confidence: 45%
Complexity: medium
7 days
Deadline
works
Contract
Deep Portfolio Analysis
- Company fit score
- Missing certificates
- Eligibility blockers
- Bid / No-Bid recommendation
AI Analysis Summary
Open tender by DB InfraGO AG for railway construction works in Hungen, Germany, for the ESTW Gießen-Nidda TK project (2nd construction phase). Two lots: Lot 1 (fiber optic cable laying) and Lot 2 (installation of intrusion and fire alarm systems). The tender is part of a larger signalling modernisation. Submission deadline 2026-06-22, only 15 days from publication. Award based solely on price. No estimated value disclosed. Strict eligibility with DB-specific prequalification required. Documents available via online portal but not analyzed.
Strengths
Documents available
Open procedure
Medium complexity
Risks
Submission deadline in 7 days
Analysis may be incomplete
Only part of the procurement documentation was analyzed. Additional eligibility requirements, certificates, or submission documents may exist in the remaining tender documentation.
Key Requirements
- Electronic submission via DB's bieterportal is required.
- Tenders must be submitted in German; documents available only in German.
- Variants are allowed per XML notice.
Award Criteria
Preis
Preis
| Criterion | Type |
|---|---|
Preis Preis | Price |
Buyer
Name
DB InfraGO AG – Geschäftsbereich Fahrweg (Bukr 16)
Location
Frankfurt Main, DEU
Identifier
fb197f94-7578-4673-8a57-4642ae120532
Lots (2)
Laying of fiber optic cables for the ESTW signalling system on the specified railway line section.
Installation of intrusion detection and fire alarm systems for the ESTW signalling system on the specified railway line section.
Procurement Details
Publication
07 Jun 2026
Deadline
22 Jun 2026, 07:00
Procedure
open
Contract
works
Language
DEU
Publication #
389023-2026
Classification
Performance: Germany
Documents (2)
Opportunity Score
Confidence: 45%
Complexity: medium
7 days
Deadline
works
Contract
Deep Portfolio Analysis
- Company fit score
- Missing certificates
- Eligibility blockers
- Bid / No-Bid recommendation