BA-26-023-GK Project reserve water Gjøvik-Biri ENT1B Raw water pump station
Originaltitel der Bekanntmachung
Norway – Pipeline, piping, pipes, casing, tubing and related items – BA-26-023-GK Project reserve water Gjøvik-Biri ENT1B Raw water pump station
Opportunity Score
Warum diese Bewertung?
Chance
60 / 100
Komplexität
70 / 100
Risikofaktoren
Missing procurement documents: only the TED notice was analyzed. Crucial details on terms, conditions, specifications...
Specific technical requirements (waterproof concrete, deep sheet pitting, pressurized pipes Ø500mm+, steel pipes PN16)...
No procurement documents available
Tiefe Portfolioanalyse
Verwendet:
- Description
- Industries & Services
- Capabilities
- Market & Experience
- Certifications
Überblick
Moderate opportunityWichtige Fakten
- NOK 95M estimated value
- Supplies contract
- 1 lot
- Duration 46 MONTH
- Establishment of raw water pump station
- Execution of pipelines from ENT2 to ENT3 (land pipeline contract)
Vollständige Zusammenfassung anzeigen
This tender, issued by Gjøvik Municipality (Norway), is for the establishment of a raw water pump station as part of a backup water supply system for Gjøvik and Biri. The project is the second stage of a larger initiative and includes pipeline work, pump installation, and associated construction. The contract is valued at 95,000,000 NOK with a duration of 46 months. The procedure is a negotiated procedure with a call for competition (neg-w-call). The deadline for submission is 31 July 2026. The award is based on price (55%), climate/environment (30%), and implementation plan (15%). Only one lot is identified.
Risiken
Missing procurement documents: only the TED notice was analyzed. Crucial details on terms, conditions, specifications...
Specific technical requirements (waterproof concrete, deep sheet pitting, pressurized pipes Ø500mm+, steel pipes PN16)...
No procurement documents available
Analyse kann unvollständig sein
Nur ein Teil der Vergabeunterlagen wurde analysiert. Weitere Anforderungen, Zertifikate oder Einreichungsdokumente können in den übrigen Unterlagen enthalten sein.
Wichtige Anforderungen
Technical
- Sufficient financial capacity (annual accounts 2024/2025, credit rating ≤6 months old)
- Relevant experience in waterproof concrete, deep sheet pitting, pressurized pipes, pumps, and steel pipes (max 4 reference projects in last 10 years)
Certifications
- Legally established company (registration certificate or equivalent)
Anforderungen können unvollständig sein.
Zuschlagskriterien
Lot 1
Auftraggeber
Name
Ort
Gjøvik, NOR
Website
Auftraggeberprofil
Kennung
940155223
Tätigkeit
General public services
Lose (1)
LOT-0001
BA-26-023-GK Project reserve water Gjøvik-Biri ENT1B Raw water pump station
Establishment of a raw water pump station including execution of pipelines from ENT2 to the land pipeline contract (ENT3). Scope includes waterproof concrete, deep sheet pitting, pressurized stainless steel pipes, pump delivery/installation, and steel pipes. Part of a backup water system for Gjøvik and Biri.
EUR 8.8M
Geschätzter Wert
Ort
Dauer
Kategorie
Zuschlagskriterien
Frist
Zuschlagsdetails
Price
Climate and environment
Implementation plan
Zusätzliche CPV-Codes
Originale TED-Daten anzeigen
Originale TED-Beschreibung
Gjøvik municipality is responsible for ensuring a safe and stable delivery of drinking water to the inhabitants of the municipality. In order to strengthen security of supply, it has been decided to establish a full-fledged back-up water system that can supply both Biri and Gjøvik. Stage 1 of the project included the establishment of an submarine pipeline from Gjøvik to Redalen, the construction of a pressure increase station, as well as the establishment of a connection point for the continuation of the pipeline towards Biri. The sea pipeline was lowered in Mjøsa in autumn 2020, and after completion of the pump station the facility was put into operation in 2021. In stage 2 the pipeline shall be continued from Redalen to Biri, where both a raw water pump station and a new water treatment plant shall be established. In this contract, the establishment of a raw water pump station with the execution of pipelines from ENT2 up until the land pipeline contract ("ENT3") shall be executed.
Vergabedetails
- Veröffentlichungsdatum
- 02 Jun 2026
- Sprachen
- English, Norwegian
Referenzmetadaten
- Rechtsgrundlage
- 32014L0025
Referenz-IDs
- Ausschreibungs-ID
- 382098-2026
Dokumente (1)
Ähnliche Ausschreibungen
Ireland – Steel – Dynamic Purchasing System (DPS) for Course Consumables for use in Donegal Education and Training Board Training Centres and Schools
France – Construction work for water projects – Travaux d’entretien et de réparation d’ouvrages hydrauliques
Germany – Sewer construction work – Schulprojekt Kardinal-von-Galen-Schule - RW-Kanäle, SW-Kanäle,Rückhaltebecken, Trinkwasserleitungen
Germany – Construction work for water and sewage pipelines – Leitungsbau im Spülbohrverfahren
Denmark – Construction work – Kvalifikationsordning vedrørende hovedentrepriser for etablering og udvidelse af gasanlæg
Sweden – Heating, ventilation and air-conditioning installation work – DIS - Undercentraler och värmepumpsanläggningar
Opportunity Score
Warum diese Bewertung?
Chance
60 / 100
Komplexität
70 / 100
Risikofaktoren
Missing procurement documents: only the TED notice was analyzed. Crucial details on terms, conditions, specifications...
Specific technical requirements (waterproof concrete, deep sheet pitting, pressurized pipes Ø500mm+, steel pipes PN16)...
No procurement documents available