Poland – Construction work for pipelines, communication and power lines, for highways, roads, airfields and railways; flatwork – Zaprojektowanie i budowa obwodnicy Limanowej w ciągu DK 28
Opportunity Score
Confidence: 65%
Complexity: high
8 days
Deadline
works
Contract
Deep Portfolio Analysis
- Company fit score
- Missing certificates
- Eligibility blockers
- Bid / No-Bid recommendation
AI Analysis Summary
Public works contract for design and construction of a bypass around Limanowa along national road DK28 in Poland. The project involves a new 5.36 km road section with engineering structures and accompanying infrastructure, including design, permits, construction, as-built documentation, and usage permit. Single lot, open procedure, no framework or DPS. Estimated value not provided. Duration 49 months. Strict financial and experience eligibility criteria. Award based 60% price, 40% quality.
Strengths
Documents available
Open procedure
8 days left
Risks
Submission deadline in 8 days
Analysis may be incomplete
Only part of the procurement documentation was analyzed. Additional eligibility requirements, certificates, or submission documents may exist in the remaining tender documentation.
Key Requirements
- Open procedure, electronic submission only via platform at Open portal
- Submission in Polish language
- Bid bond (wadium) of 3,300,000 PLN
Award Criteria
Kryterium ceny
Waga kryterium wynosi 60% = 60 pkt. Kryterium „Cena” będzie rozpatrywana na podstawie ceny brutto za wykonanie przedmiotu zamówienia, podanej przez Wykonawcę na Formularzu Oferty. Zamawiający ofercie o najniżej cenie spośród ofert ocenianych przyzna 60 punktów a każdej następnej zostanie przyporządkowana liczba punktów proporcjonalnie mniejsza, według wzoru: C = C min/ C o x 60 pkt gdzie: C min – najniższa cena brutto z ocenianych ofert (zł) C o – cena brutto badanej oferty (zł)
| Criterion | Type |
|---|---|
Kryterium ceny Waga kryterium wynosi 60% = 60 pkt. Kryterium „Cena” będzie rozpatrywana na podstawie ceny brutto za wykonanie przedmiotu zamówienia, podanej przez Wykonawcę na Formularzu Oferty. Zamawiający ofercie o najniżej cenie spośród ofert ocenianych przyzna 60 punktów a każdej następnej zostanie przyporządkowana liczba punktów proporcjonalnie mniejsza, według wzoru: C = C min/ C o x 60 pkt gdzie: C min – najniższa cena brutto z ocenianych ofert (zł) C o – cena brutto badanej oferty (zł) | Price |
Buyer
Name
Generalna Dyrekcja Dróg Krajowych i Autostrad
Location
Kraków, POL
Website
Identifier
REGON 017511575
Lots (1)
Design and construction of a bypass around Limanowa along national road DK28, approximately 5.36 km, including engineering structures and infrastructure, design documentation, obtaining permits, construction, as-built documentation, and obtaining occupancy permit.
Procurement Details
Publication
02 Jun 2026
Deadline
25 Jun 2026, 09:15
Procedure
open
Contract
works
Duration
49 MONTH
Language
POL
Publication #
378975-2026
Classification
Performance: Poland
Documents (2)
Similar tenders
Poland – Water-treatment plant construction work – Wykonanie robót budowlanych w budynku osadników ZPW MD
Poland – Construction work – Budowa Centrum Wypoczynku i Rekreacji w Kumowej Dolinie w Chełmie
Poland – Construction work – Wykonanie robót budowlanych w formule zaprojektuj i wybuduj dla zadania pn.:Modernizacja istniejącego lądowiska wyniesionego dla śmigłowców ratunkowych "Koszalin-Szpital"
Poland – Construction work – Wykonanie robót montażowo -budowlanych po uprzednim opracowaniu dokumentacji projektowo – kosztorysowej dla - dostosowanie nawierzchni zakup i posadowienie ośmiu hal namiotowych w systemie „zaprojektuj wybuduj”-Braniewo-postępowanie nr 20/RB
Poland – Construction work – Przebudowa instalacji termicznego przekształcania odpadów medycznych i weterynaryjnych przy Szpitalu Specjalistycznym Ducha Świętego w Sandomierzu w formule partnerstwa publiczno-prywatnego
Poland – Construction work – Realizacja decyzji PINB, ul. Kościuszki 8
Opportunity Score
Confidence: 65%
Complexity: high
8 days
Deadline
works
Contract
Deep Portfolio Analysis
- Company fit score
- Missing certificates
- Eligibility blockers
- Bid / No-Bid recommendation