New Caledonia – Construction work for dams and similar fixed structures – STEP de Tontouta - Nouvelle Calédonie
Opportunity Score
Confidence: 35%
Complexity: high
—
Deadline
works
Contract
Deep Portfolio Analysis
- Company fit score
- Missing certificates
- Eligibility blockers
- Bid / No-Bid recommendation
AI Analysis Summary
This tender is for a two-phase contract (ECI then potential EPC) for the design and construction of a 100 MW pumped-storage hydroelectric plant (STEP) near the Tontouta River in New Caledonia. The structured data provides only partial lot details with incomplete values, deadlines, and criteria. The XML notice indicates a submission deadline of June 15, 2026, and a candidate limitation to 4. No procurement documents were analyzed.
Strengths
Electronic submission
Risks
No procurement documents available
Analysis may be incomplete
Only part of the procurement documentation was analyzed. Additional eligibility requirements, certificates, or submission documents may exist in the remaining tender documentation.
Key Requirements
- Two-phase procedure: Phase 1 (ECI) with an option for Phase 2 (EPC) if the contracting authority decides to proceed
- Electronic submission required via Open portal
- All submissions must be in French
Buyer
Name
Société Néo-Calédonienne d'Energie
Location
Nouméa, NCL
Website
Buyer profile
Identifier
103 916 334
Lots (1)
ECI phase (detail design, risk analysis, EPC price confirmation) and possible subsequent EPC contract for construction of upper and lower basins, penstock, powerhouse, and grid connection.
Procurement Details
Publication
01 Jun 2026
Deadline
—
Procedure
open
Contract
works
Duration
12 MONTH
Language
FRA
Publication #
375171-2026
Classification
Documents (1)
Opportunity Score
Confidence: 35%
Complexity: high
—
Deadline
works
Contract
Deep Portfolio Analysis
- Company fit score
- Missing certificates
- Eligibility blockers
- Bid / No-Bid recommendation