France – Multi-dwelling buildings construction work – K'nal St Etienne : Construction de 43 logements aidés collectifs + 1 LCR - Commune de Saint-Pierre
Opportunity Score
Confidence: 50%
Complexity: high
42 days
Deadline
works
Contract
Deep Portfolio Analysis
- Company fit score
- Missing certificates
- Eligibility blockers
- Bid / No-Bid recommendation
AI Analysis Summary
This open tender by SEDRE (France) concerns the construction of 43 social housing units and a communal room in Saint-Pierre, Réunion. The project is divided into 15 separate lots covering various construction trades. The total estimated value is €6,200,000. The tender is conducted under the EU directive 2014/24/EU, French law, and requires electronic submission. Key dates: submission deadline 2026-07-27T08:00:00Z, planned start 2026-10-14, overall duration 35 months. Award criteria are price (60%) and technical quality (40%). The procurement documents are available online but were not analyzed in detail.
Strengths
Documents available
Open procedure
42 days left
Analysis may be incomplete
Only part of the procurement documentation was analyzed. Additional eligibility requirements, certificates, or submission documents may exist in the remaining tender documentation.
Key Requirements
- Electronic submission is required via the buyer profile (AW Solutions).
- Tenders must be submitted in French (FRA).
- Variants are allowed, but multiple tenders per lot are not allowed.
Buyer
Name
SEDRE
Location
Saint-Denis Cedex, FRA
Website
Buyer profile
Identifier
55616
Lots (15)
Earthworks, road and network development, fencing.
Structural work, hard floor finishes (main lot). Includes optional items for removal of hard finishes on verandas, terraces, staircases and walkways.
Roof framing, roofing, cladding. Includes optional wood cladding for transformer enclosure.
Procurement Details
Publication
31 May 2026
Deadline
27 Jul 2026, 08:00
Procedure
open
Contract
works
Duration
35 MONTH
Language
FRA
Publication #
371055-2026
Classification
Performance: France
Documents (2)
Opportunity Score
Confidence: 50%
Complexity: high
42 days
Deadline
works
Contract
Deep Portfolio Analysis
- Company fit score
- Missing certificates
- Eligibility blockers
- Bid / No-Bid recommendation