Heavy civils enabling works for MetroLink Dublin
Originaltitel der Bekanntmachung
Ireland – Engineering works and construction works – MetroLink, Dublin – M120 Heavy Civils Enabling Works Framework Agreement
Opportunity Score
Warum diese Bewertung?
Chance
60 / 100
Komplexität
90 / 100
Risikofaktoren
Selection criteria (financial, technical, experience) are not provided in the notice or extracted documents. Bidders ma...
Award criteria for the framework and future call-offs are not specified. This creates uncertainty in how bids will be e...
Tiefe Portfolioanalyse
Verwendet:
- Description
- Industries & Services
- Capabilities
- Market & Experience
- Certifications
Überblick
Moderate opportunityWichtige Fakten
- EUR 1200M estimated value
- Framework procurement
- Works contract
- 2 lots
- Duration 8 YEAR
- Site set up, hoarding, logistics, welfare management
- Utilities diversions and works
Vollständige Zusammenfassung anzeigen
The M120 Heavy Civils Enabling Works Framework Agreement, issued by Transport Infrastructure Ireland (TII), aims to procure civil engineering works for the MetroLink programme in Dublin. It is a multi-party framework agreement with two value-based lots: Lot 1 (≥€50M/complex works) and Lot 2 (<€50M). The framework duration is 5 years, extendable up to 8 years. Only one lot per applicant. The procedure is negotiated with call-off. Submission deadline: 2026-07-13T13:00Z. Key risks: missing selection/award criteria in provided data, high competition (max 3 per lot), and no guaranteed volume of work.
Risiken
Selection criteria (financial, technical, experience) are not provided in the notice or extracted documents. Bidders ma...
Award criteria for the framework and future call-offs are not specified. This creates uncertainty in how bids will be e...
Analyse kann unvollständig sein
Nur ein Teil der Vergabeunterlagen wurde analysiert. Weitere Anforderungen, Zertifikate oder Einreichungsdokumente können in den übrigen Unterlagen enthalten sein.
Wichtige Anforderungen
Technical
- Applicants may apply for only one lot
- Stage 1: PQQ assessment (financial, technical, experience) – shortlist up to 5 per lot
Administrative
- Must register and submit via Metrolink e-Sourcing portal (Jaggaer)
Anforderungen können unvollständig sein.
Zuschlagskriterien
Lot 1
Lot 2
Auftraggeber
Ort
Dublin, IRL
Website
Auftraggeberprofil
Kennung
9510201H
Tätigkeit
General public services
Lose (2)
LOT-0001
Lot 1 Heavy Civils Enabling Works for Call-off Contracts (≥€50M)
Lot 1 covers large civils works including station boxes, tunnel portals, viaducts. First call-off is Dublin Airport station box. Estimated framework max value €1B (excl. VAT).
EUR 1.2B
Geschätzter Wert
Ort
Dauer
Kategorie
Zuschlagskriterien
Frist
Zuschlagsdetails
Lot 1 will consist of call off contracts for large elements of civils works, which may include station boxes, tunnel portals, single or multi span viaducts, and other contract packages. The first call off contract to be awarded under Lot 1 will be for the construction of the underground MetroLink station box at Dublin Airport (the “Dublin Airport station box”). Further call offs under Lot 1 are anticipated potentially for additional station box/es, tunnel portal/s, single or multi span viaducts, or other related contract packages yet to be identified. The scope of this first call off contract under Lot 1 for the Dublin Airport station box is expected to comprise the following: • Detailed reinforcement design, design of all temporary works, design the construction methodology, to deliver the works (TII will provide the detailed design of the station box) • perform the roles of PSDP and PSCS • Consultation with daa, TII and other key stakeholders for the contractors design, traffic management, site logistics, construction equipment restrictions etc. • Surveys and/or additional ground investigations as maybe required • Erection and maintenance of site/access hoarding • Removal of any existing barriers, bollards, kerbs and street furniture • Removal or diversion of any utilities • Excavation works • Demolition and removal of materials from any structures on site • Construction of triage centre for PFAS • Analysis, treatment and disposal of PFAS contaminated soil • All construction works required for the construction of the airport station box • Any other works as may be required for interfacing with the M100, M400 and M500 Contracts • Procurement of ancillary equipment as may be necessary • Provison of as-built digital models/drawings and asset records • Preparation of site for take-over by other MetroLink contractors • Any other related works Refer to the PQQ documents for further information.
Zusätzliche CPV-Codes
Hinweis zum Wert
Maximalwert der Rahmenvereinbarung
Originale TED-Daten anzeigen
Originaler Los-Titel
Lot 1 Heavy Civils Enabling Works for Call-off Contracts with an estimated value of €50 million or more (excluding VAT) and those determined by the Contracting Authority to be complex call-off contracts of any value which may require specific technical or specialist resources.
Originale TED-Beschreibung
Lot 1 will consist of call off contracts for large elements of civils works, which may include station boxes, tunnel portals, single or multi span viaducts, and other contract packages. The first call off contract to be awarded under Lot 1 will be for the construction of the underground MetroLink station box at Dublin Airport (the “Dublin Airport station box”). Further call offs under Lot 1 are anticipated potentially for additional station box/es, tunnel portal/s, single or multi span viaducts, or other related contract packages yet to be identified. The scope of this first call off contract under Lot 1 for the Dublin Airport station box is expected to comprise the following: • Detailed reinforcement design, design of all temporary works, design the construction methodology, to deliver the works (TII will provide the detailed design of the station box) • perform the roles of PSDP and PSCS • Consultation with daa, TII and other key stakeholders for the contractors design, traffic management, site logistics, construction equipment restrictions etc. • Surveys and/or additional ground investigations as maybe required • Erection and maintenance of site/access hoarding • Removal of any existing barriers, bollards, kerbs and street furniture • Removal or diversion of any utilities • Excavation works • Demolition and removal of materials from any structures on site • Construction of triage centre for PFAS • Analysis, treatment and disposal of PFAS contaminated soil • All construction works required for the construction of the airport station box • Any other works as may be required for interfacing with the M100, M400 and M500 Contracts • Procurement of ancillary equipment as may be necessary • Provison of as-built digital models/drawings and asset records • Preparation of site for take-over by other MetroLink contractors • Any other related works Refer to the PQQ documents for further information.
LOT-0002
Lot 2 Heavy Civils Enabling Works for Call-off Contracts (<€50M)
Lot 2 covers smaller civils works like retaining walls and foundation works. First call-off is Glasnevin station retaining wall. Estimated framework max value €200M (excl. VAT).
EUR 1.2B
Geschätzter Wert
Ort
Dauer
Kategorie
Zuschlagskriterien
Frist
Zuschlagsdetails
Lot 2 will consist of call off contracts for elements of civils works, which may include retaining walls, other foundation/support works, as well as other contract packages The first call off contract to be awarded under Lot 2 will be for the construction of the canal side retaining wall at Glasnevin station (the “Glasnevin station retaining wall”). Further call offs under Lot 2 are anticipated potentially for additional retaining walls, construction of walkways/bridges, or other related contract packages yet to be identified. The scope of this first call off contract under Lot 2 is expected to comprise the following: • Ground monitoring surveys and soil/rock/water table analysis • Installation of instrumentation and monitoring to existing structures (e.g. canal basin/walls and Irish Rail gravity retaining walls) • perform the roles of PSDP and PSCS • Continuous consultation with Irish Rail, TII, Waterways Ireland and other key stakeholders • Erection and maintenance of site/access hoarding (welfare block) • Removal of any barriers, bollards, kerbs and any street furniture • Removal or diversion of any utilities • Demolition and removal of materials from any existing buildings • Demolition and/or removal of any piling columns or foundation materials as may be required • Construction of support columns and/or piles as may be required • Construction works of new retaining wall and any other support structures • Any other works as may be required for interfacing with M100, M400 and M500 contracts • Provison of as-built digital models/drawings and asset records • Preparation of site for take-over by other MetroLink contractors. Refer to the PQQ documents for further information.
Zusätzliche CPV-Codes
Hinweis zum Wert
Maximalwert der Rahmenvereinbarung
Originale TED-Daten anzeigen
Originaler Los-Titel
Lot 2 Heavy Civils Enabling Works for Call-off contracts with an estimated value less than €50 million (excluding VAT) except those to be included in Lot 1.
Originale TED-Beschreibung
Lot 2 will consist of call off contracts for elements of civils works, which may include retaining walls, other foundation/support works, as well as other contract packages The first call off contract to be awarded under Lot 2 will be for the construction of the canal side retaining wall at Glasnevin station (the “Glasnevin station retaining wall”). Further call offs under Lot 2 are anticipated potentially for additional retaining walls, construction of walkways/bridges, or other related contract packages yet to be identified. The scope of this first call off contract under Lot 2 is expected to comprise the following: • Ground monitoring surveys and soil/rock/water table analysis • Installation of instrumentation and monitoring to existing structures (e.g. canal basin/walls and Irish Rail gravity retaining walls) • perform the roles of PSDP and PSCS • Continuous consultation with Irish Rail, TII, Waterways Ireland and other key stakeholders • Erection and maintenance of site/access hoarding (welfare block) • Removal of any barriers, bollards, kerbs and any street furniture • Removal or diversion of any utilities • Demolition and removal of materials from any existing buildings • Demolition and/or removal of any piling columns or foundation materials as may be required • Construction of support columns and/or piles as may be required • Construction works of new retaining wall and any other support structures • Any other works as may be required for interfacing with M100, M400 and M500 contracts • Provison of as-built digital models/drawings and asset records • Preparation of site for take-over by other MetroLink contractors. Refer to the PQQ documents for further information.
Vergabedetails
- Veröffentlichungsdatum
- 28 May 2026
- Sprachen
- English
Referenzmetadaten
- Rechtsgrundlage
- 32014L0025
Referenz-IDs
- Ausschreibungs-ID
- 370633-2026
Dokumente (1)
Ähnliche Ausschreibungen
Poland – Engineering design services for mechanical and electrical installations for buildings – Opracowanie kompleksowej dokumentacji projektowej obejmującej projekt budowlany, techniczny i wykonawczy dla realizacji systemów zasilania awaryjnego z wykorzystaniem agregatów prądotwórczych
France – Construction work for school buildings – Travaux d'extension et rénovation complète du collège Charles EXBRAYAT à LA GRAND CROIX
France – Geotechnical engineering services – Réalisation de sondages et d'études géotechniques
France – Construction work for multi-dwelling buildings and individual houses – MARCHE DE TRAVAUX POUR LA CONSTRUCTION DE 44 LOGEMENTS COLLECTIFS, UN LOCAL D'ACTIVITE EN RDC ET 37 PLACES DE STATIONNEMENT SUR UN NIVEAU DE SOUS-SOL A CACHAN (94)
France – Structural shell work – Marché de travaux pour la construction du MUCAP, musée des captivités de guerre à Ravenoville, commune de Sainte-Mère-Eglise (50) - Lot 01 Gros-oeuvre
France – Restructuring work – RESTRUCTURATION DES ARCHIVES DEPARTEMENTALES DE LA HAUTE-GARONNE - 11 et 14 BOULEVARD GRIFFOUL DORVAL A TOULOUSE - TRAVAUX 8 LOTS
Opportunity Score
Warum diese Bewertung?
Chance
60 / 100
Komplexität
90 / 100
Risikofaktoren
Selection criteria (financial, technical, experience) are not provided in the notice or extracted documents. Bidders ma...
Award criteria for the framework and future call-offs are not specified. This creates uncertainty in how bids will be e...
Tiefe Portfolioanalyse
Verwendet:
- Description
- Industries & Services
- Capabilities
- Market & Experience
- Certifications