Slovakia – Railway construction works – ŽSR, Diaľkové ovládanie zabezpečovacieho zariadenia v úseku trate Strážske – Prešov
Opportunity Score
Confidence: 40%
Complexity: high
14 days
Deadline
works
Contract
Deep Portfolio Analysis
- Company fit score
- Missing certificates
- Eligibility blockers
- Bid / No-Bid recommendation
AI Analysis Summary
Open tender by Železnice Slovenskej republiky for design and construction of remote-controlled signaling equipment on the Strážske–Prešov railway line, including associated infrastructure works. Single lot, estimated value €47.31M, duration 42 months. Award based on lowest price. Electronic submission required by 29 June 2026.
Strengths
Documents available
Open procedure
14 days left
Risks
Submission deadline in 14 days
Analysis may be incomplete
Only part of the procurement documentation was analyzed. Additional eligibility requirements, certificates, or submission documents may exist in the remaining tender documentation.
Key Requirements
- Open procedure.
- Electronic submission via JOSEPHINE platform.
- Submission in Slovak or Czech language.
Award Criteria
Celková cena
Celková cena vyjadrená v EUR bez DPH za celý predmet zákazky
| Criterion | Type |
|---|---|
Celková cena Celková cena vyjadrená v EUR bez DPH za celý predmet zákazky | Price |
Buyer
Name
Železnice Slovenskej republiky
Location
Bratislava, SVK
Buyer profile
Identifier
31364501
Lots (3)
Design, construction, engineering, geodetic survey, and MPV for signaling equipment (category 3), new communication/information/radio devices, remote control from LCRD Prešov with backup in Vranov nad Topľou, and renewal of infrastructure (switches, lighting, etc.). Must ensure interoperability per EU Directive 2016/797.
Additional CPV: 45231400 - Construction work for railways.
Additional CPV: 45316210 - Installation of traffic signalling equipment.
Procurement Details
Publication
28 May 2026
Deadline
29 Jun 2026, 06:59
Procedure
open
Contract
works
Duration
42 MONTH
Language
SLK, CES
Publication #
370105-2026
Classification
Performance: Slovakia
Documents (2)
Opportunity Score
Confidence: 40%
Complexity: high
14 days
Deadline
works
Contract
Deep Portfolio Analysis
- Company fit score
- Missing certificates
- Eligibility blockers
- Bid / No-Bid recommendation