Tenderwize
Zurück zur Suche

Germany – Transformers – Phasenschiebertransformatoren (PST) 150 MVA für die UW Leinhausen und Linden

enercity AGHannover, GermanyNot disclosed0 days leftopen
40

Opportunity Score

Confidence: 60%

Complexity: high

0 days

Deadline

supplies

Contract

Deep Portfolio Analysis

  • Company fit score
  • Missing certificates
  • Eligibility blockers
  • Bid / No-Bid recommendation
Create account for AI analysis

AI Analysis Summary

Moderate opportunity

This tender by enercity AG (Germany) is for the supply, installation, commissioning, and documentation of two identical 150 MVA phase-shifting transformers (PST) for the Leinhausen and Linden substations in Hanover. The procedure is a negotiated with call for competition under the Utilities Directive (2014/25/EU). The estimated value is not provided. The deadline for submission is 2026-06-15 23:59:59. Award is based solely on price.

Strengths

Documents available

0 days left

Electronic submission

Risks

Submission deadline in 0 days

Analysis may be incomplete

Only part of the procurement documentation was analyzed. Additional eligibility requirements, certificates, or submission documents may exist in the remaining tender documentation.

Key Requirements

  • Minimum average annual turnover of €30 million (net) in the EU over last 3 years
  • At least 2 reference projects with voltage ≥72.5 kV, power ≥80 MVA, phase-shifting transformer with quadrature and longitudinal regulation, completed within last 5 years
  • ISO 9001 and ISO 14001 certifications

Award Criteria

preisliche Bewertung

In Rahmen der Angebotsphase wird der Preis als Zuschlagskriterium herausgezogen. Daher erwarten wir, dass die Angebote preislich wettbewerbsfähig sind.

Type: Price

Buyer

Name

enercity AG

Location

Hannover, DEU

Identifier

DE 250980382

Lots (1)

#LOT-0001Phasenschiebertransformatoren (PST) 150 MVA für die UW Leinhausen und Linden

Supply, installation, commissioning, and documentation of two PSTs including control cabinets. Scope includes planning for control and selectivity protection, all tests, training, and full technical documentation. Delivery timeline: factory test by March 2030, delivery and installation by July 2030, commissioning by November 2030 for each substation.

31170000, 51111300, 31211110

Procurement Details

Publication

25 May 2026

Deadline

15 Jun 2026, 21:59

Procedure

open

Contract

supplies

Language

DEU, ENG

Publication #

356873-2026

Classification

Documents (2)