Germany – Transformers – Phasenschiebertransformatoren (PST) 150 MVA für die UW Leinhausen und Linden
Opportunity Score
Confidence: 60%
Complexity: high
0 days
Deadline
supplies
Contract
Deep Portfolio Analysis
- Company fit score
- Missing certificates
- Eligibility blockers
- Bid / No-Bid recommendation
AI Analysis Summary
This tender by enercity AG (Germany) is for the supply, installation, commissioning, and documentation of two identical 150 MVA phase-shifting transformers (PST) for the Leinhausen and Linden substations in Hanover. The procedure is a negotiated with call for competition under the Utilities Directive (2014/25/EU). The estimated value is not provided. The deadline for submission is 2026-06-15 23:59:59. Award is based solely on price.
Strengths
Documents available
0 days left
Electronic submission
Risks
Submission deadline in 0 days
Analysis may be incomplete
Only part of the procurement documentation was analyzed. Additional eligibility requirements, certificates, or submission documents may exist in the remaining tender documentation.
Key Requirements
- Minimum average annual turnover of €30 million (net) in the EU over last 3 years
- At least 2 reference projects with voltage ≥72.5 kV, power ≥80 MVA, phase-shifting transformer with quadrature and longitudinal regulation, completed within last 5 years
- ISO 9001 and ISO 14001 certifications
Award Criteria
preisliche Bewertung
In Rahmen der Angebotsphase wird der Preis als Zuschlagskriterium herausgezogen. Daher erwarten wir, dass die Angebote preislich wettbewerbsfähig sind.
| Criterion | Type |
|---|---|
preisliche Bewertung In Rahmen der Angebotsphase wird der Preis als Zuschlagskriterium herausgezogen. Daher erwarten wir, dass die Angebote preislich wettbewerbsfähig sind. | Price |
Buyer
Name
enercity AG
Location
Hannover, DEU
Website
Identifier
DE 250980382
Lots (1)
Supply, installation, commissioning, and documentation of two PSTs including control cabinets. Scope includes planning for control and selectivity protection, all tests, training, and full technical documentation. Delivery timeline: factory test by March 2030, delivery and installation by July 2030, commissioning by November 2030 for each substation.
Procurement Details
Publication
25 May 2026
Deadline
15 Jun 2026, 21:59
Procedure
open
Contract
supplies
Language
DEU, ENG
Publication #
356873-2026
Classification
Documents (2)
Opportunity Score
Confidence: 60%
Complexity: high
0 days
Deadline
supplies
Contract
Deep Portfolio Analysis
- Company fit score
- Missing certificates
- Eligibility blockers
- Bid / No-Bid recommendation