Netherlands – Electricity distribution and control apparatus – Levering en montage transformatoren en railkoppelingen
Opportunity Score
Confidence: 35%
Complexity: low
24 days
Deadline
supplies
Contract
Deep Portfolio Analysis
- Company fit score
- Missing certificates
- Eligibility blockers
- Bid / No-Bid recommendation
AI Analysis Summary
Open tender by Evides N.V. for supply and installation of transformers (Lot 1) and busbar systems (Lot 2) for a new drinking water treatment plant in the Netherlands. The tender is divided into two lots, each awarded separately based on lowest price. The estimated value is symbolic (1 EUR), actual value not disclosed. The procedure is open, SME suitable, with submission deadline 2026-07-09. Documentation is available online but not analyzed in detail.
Strengths
Documents available
Open procedure
Low complexity
Analysis may be incomplete
Only part of the procurement documentation was analyzed. Additional eligibility requirements, certificates, or submission documents may exist in the remaining tender documentation.
Key Requirements
- Tenders must comply with product specifications
- Electronic submission via Mercell platform allowed
- Submission in Dutch language
Award Criteria
Laagste prijs
Betreft laagste prijs, leverancier dient te leveren conform productspecificatie. Er zijn geen kwalitatieve voordelen te behalen.
| Criterion | Type |
|---|---|
Laagste prijs Betreft laagste prijs, leverancier dient te leveren conform productspecificatie. Er zijn geen kwalitatieve voordelen te behalen. | Price |
Buyer
Name
Evides N.V.
Location
Rotterdam, NLD
Buyer profile
Identifier
24170650
Lots (2)
Supply and installation of transformers including mounting, as per product specifications.
Supply of busbar systems (rail couplings) for the water treatment plant, as per documentation.
Procurement Details
Publication
25 May 2026
Deadline
09 Jul 2026, 10:00
Procedure
open
Contract
supplies
Language
NLD
Publication #
356549-2026
Classification
Performance: Netherlands
Documents (2)
Opportunity Score
Confidence: 35%
Complexity: low
24 days
Deadline
supplies
Contract
Deep Portfolio Analysis
- Company fit score
- Missing certificates
- Eligibility blockers
- Bid / No-Bid recommendation