Germany – Museum construction work – Los 68 - Aufzug; Lindenau-Museum Altenburg, Gabelentzstraße 5, 04600 Altenburg, Grundsanierung und Restaurierung
Opportunity Score
Confidence: 65%
Complexity: medium
1 days
Deadline
works
Contract
Deep Portfolio Analysis
- Company fit score
- Missing certificates
- Eligibility blockers
- Bid / No-Bid recommendation
AI Analysis Summary
Single lot (Lot 68) for supply and installation of a passenger elevator at Lindenau-Museum Altenburg, including bronze cabin and shaft doors. Open procedure, price-only award. No estimated value provided. Deadline: 2026-06-16. Only German language accepted. Requires three references, one with comparable cabin dimensions or high-end materials. Performance period: August 2026 – February 2028.
Strengths
Documents available
Open procedure
Medium complexity
Risks
Submission deadline in 1 days
Analysis may be incomplete
Only part of the procurement documentation was analyzed. Additional eligibility requirements, certificates, or submission documents may exist in the remaining tender documentation.
Key Requirements
- Submission only via the electronic platform e-Vergabe with registration
- German language for all documents (translations required if originals in other languages)
- Tender must include Formblatt 213 (bid letter) and Bill of Quantities – missing these leads to exclusion
Buyer
Name
Landkreis Altenburger Land
Location
Altenburg, DEU
Website
Buyer profile
Identifier
16077000-0001-72
Lots (1)
Supply, assembly, and commissioning of a passenger elevator per EN ISO 8100-1/2026. Load capacity 1500 kg, travel height 13.1 m, 5 stops/8 landings, varying door heights 2100/2900 mm, cabin width 1120 mm, depth 3320 mm, height 3000 mm. Cabin and shaft doors in high-end bronze material. Part of a larger renovation project; other lots published separately.
Procurement Details
Publication
14 May 2026
Deadline
16 Jun 2026, 08:00
Procedure
open
Contract
works
Language
DEU
Publication #
331142-2026
Classification
Performance: Germany
Documents (2)
Opportunity Score
Confidence: 65%
Complexity: medium
1 days
Deadline
works
Contract
Deep Portfolio Analysis
- Company fit score
- Missing certificates
- Eligibility blockers
- Bid / No-Bid recommendation