Tenderwize
Zurück zur Suche

Belgium – Clinic construction work – Aanstelling aannemer voor nieuwbouw revalidatieziekenhuis - Engineering & Build

Nationaal Multiple Sclerose Centrum VZWMelsbroek, BelgiumNot disclosedopen
50

Opportunity Score

Confidence: 40%

Complexity: high

Deadline

works

Contract

Deep Portfolio Analysis

  • Company fit score
  • Missing certificates
  • Eligibility blockers
  • Bid / No-Bid recommendation
Create account for AI analysis

AI Analysis Summary

Moderate opportunity

This is a negotiated procedure with call for competition for an Engineering & Build contract to construct a new rehabilitation hospital (Revalidatieziekenhuis) in Mechelen, Belgium, on behalf of Nationaal Multiple Sclerose Centrum VZW. The project involves approximately 18,400 m² gross floor area, including a basement with therapy pool and a tunnel connection to the adjacent Sint-Maarten Hospital. The contract is a single lot (LOT-0001) and is not a framework agreement or DPS. The tender is conducted in Dutch only. No estimated value is provided. The deadline for submission is 13 July 2026, 09:00 local time.

Strengths

Documents available

Electronic submission

Analysis may be incomplete

Only part of the procurement documentation was analyzed. Additional eligibility requirements, certificates, or submission documents may exist in the remaining tender documentation.

Key Requirements

  • Contractor must have a recent (not older than 3 months) credit rating report from Graydon with a risk score of 51 or higher (classification C or D leads to disqualification)
  • For consortia, each member must meet the financial standing requirement individually
  • Submission must be in Dutch (NLD)

Buyer

Name

Nationaal Multiple Sclerose Centrum VZW

Location

Melsbroek, BEL

Identifier

BE0410.338.110

Lots (1)

#LOT-0001Aanstelling aannemer voor nieuwbouw revalidatieziekenhuis - Engineering & Build

Realization of a fully operational new rehabilitation hospital building for the Nationaal Multiple Sclerose Centrum, including external works but excluding medical and non-medical loose equipment. The contractor is responsible for the complete execution based on his own study, the contract documents, and the environmental permit. The contract is a result obligation (Engineering & Build) without classic design components. The project must be realized within a fixed budget, with responsibility and liability for the contractor. Key words: sustainable, contemporary, innovative, perfectly coordinated, optimized in operational costs. The contractor must establish a BIM execution model.

45215130BEL

Procurement Details

Publication

12 May 2026

Deadline

Procedure

open

Contract

works

Language

NLD

Publication #

329702-2026

Classification

Performance: Belgium

Documents (2)