Croatia – Sewage plant equipment – Projektiranje i izgradnja UPOV-a 53.000 ES s postrojenjem za solarno sušenje mulja, probni radi i NUS
Opportunity Score
Confidence: 60%
Complexity: high
23 days
Deadline
works
Contract
Deep Portfolio Analysis
- Company fit score
- Missing certificates
- Eligibility blockers
- Bid / No-Bid recommendation
AI Analysis Summary
This tender is for the design and construction of a wastewater treatment plant (UPOV) with a capacity of 53,000 ES (equivalent inhabitants), including a solar sludge drying facility, trial run, and related works. The project is part of the 'POBOLJŠANJE VODNOKOMUNALNE INFRASTRUKTURE AGLOMERACIJE VIR' initiative. The contract is a works contract under an open procedure, with a single lot. The estimated value is €32,092,000. The deadline for submission is 2026-07-08T10:00:00.000Z. The buyer is VODOVOD d.o.o. based in Zadar, Croatia.
Strengths
Documents available
Open procedure
23 days left
Analysis may be incomplete
Only part of the procurement documentation was analyzed. Additional eligibility requirements, certificates, or submission documents may exist in the remaining tender documentation.
Key Requirements
- Tenders must be submitted electronically via the EOJN platform.
- Tender language must be Croatian (HRV).
- Variants are not allowed.
Award Criteria
Cijena ponude
Cijena ponude
| Criterion | Type |
|---|---|
Cijena ponude Cijena ponude | Price |
Buyer
Name
VODOVOD d.o.o.
Location
Zadar, HRV
Website
Buyer profile
Identifier
89406825003
Lots (1)
The scope includes design (including geodetic, geotechnical, and other investigations, obtaining permits, preparation of main and detailed designs), construction of the UPOV with solar sludge drying and associated infrastructure, testing and trial run, staff training, and defect rectification. The location is Vir, Croatia.
Procurement Details
Publication
10 May 2026
Deadline
08 Jul 2026, 10:00
Procedure
open
Contract
works
Duration
38 MONTH
Language
HRV
Publication #
319472-2026
Classification
Performance: Croatia
Documents (2)
Opportunity Score
Confidence: 60%
Complexity: high
23 days
Deadline
works
Contract
Deep Portfolio Analysis
- Company fit score
- Missing certificates
- Eligibility blockers
- Bid / No-Bid recommendation