France – Geothermal power station construction work – Délégation de service public pour la création d’un réseau de géothermie, la gestion et l’exploitation des réseaux de production, de distribution et de livraison d’énergie calorifique sur le territoire de la commune du Kremlin-Bicêtre
Opportunity Score
Confidence: 40%
Complexity: high
16 days
Deadline
works
Contract
Deep Portfolio Analysis
- Company fit score
- Missing certificates
- Eligibility blockers
- Bid / No-Bid recommendation
AI Analysis Summary
This is an open procedure for a public service delegation to create, manage, and operate a geothermal heating network in Kremlin-Bicêtre, France. The contract has a duration of 384 months (32 years) and includes works, supply, and services. The tender is divided into 3 lots, but only the first lot has detailed information. The estimated value is not provided. The deadline for submission is 2026-07-01 12:00 (CEST). The tender documents are available online, and electronic submission is required. No eligibility or award criteria are specified in the structured data.
Strengths
Documents available
Open procedure
16 days left
Analysis may be incomplete
Only part of the procurement documentation was analyzed. Additional eligibility requirements, certificates, or submission documents may exist in the remaining tender documentation.
Key Requirements
- Open procedure
- Electronic submission required via Open portal
- Submission language: French
Buyer
Lots (3)
Main lot covering the creation, management, and operation of a geothermal network for heat production, distribution, and delivery in Kremlin-Bicêtre.
Lot 2 involves additional services related to water distribution (CPV 65400000) with performance in FR107. No deadline specified.
Lot 3 involves district heating (CPV 09323000) with no performance location or deadline specified.
Procurement Details
Publication
07 May 2026
Deadline
01 Jul 2026, 12:00
Procedure
open
Contract
works
Duration
384 MONTH
Language
FRA
Publication #
315851-2026
Classification
Performance: France
Documents (2)
Opportunity Score
Confidence: 40%
Complexity: high
16 days
Deadline
works
Contract
Deep Portfolio Analysis
- Company fit score
- Missing certificates
- Eligibility blockers
- Bid / No-Bid recommendation