Italy – Construction, foundation and surface works for highways, roads – APPALTO INTEGRATO,DA REDIGERE E RESTITUIRE IN MODALITA' B.I.M., PER L’AFFIDAMENTO DELLA PROGETTAZIONE ESECUTIVA E DELL’ESECUZIONE DEI LAVORI (LOTTO 1) DI COMPLETAMENTO SSV COLLEGAMENTO A2/SAN ROBERTO/CAMPO CALABRO/PIANI D'ASPROMONTE E LOTTO 2 (OPZIONE) COLLEGAMENTO FRA SANTA LUCIA DI CAMPO CALABRO E FIUMARA DI MURO ED IL COLLEGAMENTO CON LE AREE INTERNE MONTANE.

Citta' Metropolitana di Reggio CalabriaReggio di Calabria, ItalyEUR 27,496,809 / ~EUR 27,496,8090 days leftopen
60

Opportunity Score

Confidence: 40%

Complexity: high

0 days

Deadline

works

Contract

Deep Portfolio Analysis

  • Company fit score
  • Missing certificates
  • Eligibility blockers
  • Bid / No-Bid recommendation
Create account for AI analysis

AI Analysis Summary

Moderate opportunity

Integrated design and build contract (BIM required) for road completion works in Reggio Calabria, Italy. Two lots: Lot 1 (main) for SSV connection and Lot 2 (option) for additional connections. Open procedure. Submission deadline 15 June 2026.

Strengths

Documents available

Open procedure

0 days left

Risks

Submission deadline in 0 days

Analysis may be incomplete

Only part of the procurement documentation was analyzed. Additional eligibility requirements, certificates, or submission documents may exist in the remaining tender documentation.

Key Requirements

  • Integrated design and build contract
  • BIM compliance (Art. 43 D.Lgs. 36/2023)
  • Electronic submission via platform

Buyer

Name

Citta' Metropolitana di Reggio Calabria

Location

Reggio di Calabria, ITA

Identifier

80000100802

Lots (2)

#LOT-0001APPALTO INTEGRATO, CON APPLICAZIONE DI METODI E STRUMENTI DI GESTIONE INFORMATIVA DIGITALE DELLE COSTRUZIONI DI CUI ALL'ART. 43 DEL D. LGS. 36/2023, PER L'AFFIDAMENTO DELLA PROGETTAZIONE ESECUTIVA E DELL'ESECUZIONE DEI LAVORI (LOTTO 1) DI COMPLETAMENTO SSV COLLEGAMENTO A2/SAN ROBERTO/CAMPO CALABRO/PIANI D'ASPROMONTE

Design and execution of road completion for the SSV connection A2/San Roberto/Campo Calabro/Piani d'Aspromonte. Duration 730 days. BIM required.

EUR 14,129,210.1945233000ITA
#LOT-0002APPALTO INTEGRATO, CON APPLICAZIONE DI METODI E STRUMENTI DI GESTIONE INFORMATIVA DIGITALE DELLE COSTRUZIONI DI CUI ALL’ART. 43 DEL D. LGS. 36/2023, PER L’AFFIDAMENTO DELLA PROGETTAZIONE ESECUTIVA E DELL’ESECUZIONE DEI LAVORI LOTTO 2 (OPZIONE) COLLEGAMENTO FRA SANTA LUCIA DI CAMPO CALABRO E FIUMARA DI MURO” ED IL “COLLEGAMENTO CON LE AREE INTERNE MONTANE

Optional lot for connection between Santa Lucia di Campo Calabro and Fiumara di Muro, and connection with internal mountain areas. Duration 1140 days. BIM required.

EUR 13,367,598.9745233000ITA

Procurement Details

Publication

05 May 2026

Deadline

15 Jun 2026, 10:00

Procedure

open

Contract

works

Duration

730 DAY

Language

ITA

Publication #

311502-2026

Classification

Performance: Italy