Denmark – Construction work for bridges and tunnels, shafts and subways – SST04 - Tunnel og Konstruktioner
Opportunity Score
Confidence: 60%
Complexity: high
—
Deadline
works
Contract
Deep Portfolio Analysis
- Company fit score
- Missing certificates
- Eligibility blockers
- Bid / No-Bid recommendation
AI Analysis Summary
This is a large-scale public works tender for the construction of a stormwater tunnel system in the Copenhagen metropolitan area, issued by HOFOR Spildevand København A/S. The contract involves approximately 3.2 km of segment tunnel and 7 km of pipe jacking tunnel, 13 shafts, connection structures, and an outlet building. The estimated value is DKK 1.9 billion, with a duration of 104 months. The procedure is a negotiated procedure with prior call for competition. Submission is electronic in Danish, with a deadline of 2026-06-15 at 11:00 CET. Only one lot is identified.
Strengths
Documents available
Electronic submission
High budget
Analysis may be incomplete
Only part of the procurement documentation was analyzed. Additional eligibility requirements, certificates, or submission documents may exist in the remaining tender documentation.
Key Requirements
- Minimum average annual net turnover of DKK 3.5 billion over the last three completed financial years
- Electronic submission required via EU-Supply
- Tenders must be submitted in Danish
Award Criteria
Pris
Der henvises til den nærmere beskrivelse af evalueringen af underkriteriet i udbudsbetingelserne pkt. 11.1
| Criterion | Type |
|---|---|
Pris Der henvises til den nærmere beskrivelse af evalueringen af underkriteriet i udbudsbetingelserne pkt. 11.1 | Price |
Buyer
Name
HOFOR Spildevand København A/S
Location
København S, DNK
Website
Buyer profile
Identifier
26 04 31 82
Lots (1)
Construction of a stormwater tunnel system including tunnels, shafts, connection structures, an outlet building at Fiskerihavnen, and a pump station. Works include segment tunnel (approx. 3.2 km), pipe jacking tunnel (approx. 7 km), 13 shafts, and associated above-ground structures. The tunnel will store and convey stormwater to the Øresund during extreme rain events.
Procurement Details
Publication
03 May 2026
Deadline
—
Procedure
open
Contract
works
Duration
104 MONTH
Language
DAN
Publication #
301905-2026
Classification
Performance: Denmark
Documents (2)
Opportunity Score
Confidence: 60%
Complexity: high
—
Deadline
works
Contract
Deep Portfolio Analysis
- Company fit score
- Missing certificates
- Eligibility blockers
- Bid / No-Bid recommendation