Switzerland – Hydro-electric plant construction work – Pumpspeicherwerk Grimsel 4 - Bauhauptlos

Kraftwerke Oberhasli AGInnertkirchen, SwitzerlandNot disclosed116 days leftopen
60

Opportunity Score

Confidence: 30%

Complexity: high

116 days

Deadline

works

Contract

Deep Portfolio Analysis

  • Company fit score
  • Missing certificates
  • Eligibility blockers
  • Bid / No-Bid recommendation
Create account for AI analysis

AI Analysis Summary

Moderate opportunity

Swiss pumped storage hydroelectric plant construction (Grimsel 4) main works lot. Open procedure under utilities directive. Very large civil engineering project involving tunnels, caverns, and water conveyance systems. No estimated value provided. Submission by paper only, in German. Deadline 2026-10-09.

Strengths

Open procedure

116 days left

Risks

No procurement documents available

Analysis may be incomplete

Only part of the procurement documentation was analyzed. Additional eligibility requirements, certificates, or submission documents may exist in the remaining tender documentation.

Key Requirements

  • Tender must be submitted in German
  • Electronic submission not allowed; paper submission only
  • Variants are allowed

Buyer

Name

Kraftwerke Oberhasli AG

Location

Innertkirchen, CHE

Identifier

e298f179-3ec8-4a4e-b1db-fba10fb5288f

Lots (1)

#LOT-0000Pumpspeicherwerk Grimsel 4 - Bauhauptlos

Construction of main works for Grimsel 4 pumped storage plant: water conveyance system (pressure tunnels, shaft, distribution lines), cavern powerhouse, intake/outlet structure, access tunnels. Total power 150 MW, flow 70 m³/s. Includes all civil works for the hydraulic circuit between Grimselsee and Räterichsbodensee.

45251120, 45250000CHE

Procurement Details

Publication

09 Apr 2026

Deadline

09 Oct 2026, 14:00

Procedure

open

Contract

works

Language

DEU

Publication #

247400-2026

Classification

Performance: Switzerland