Tenderwize
Zurück zur Suche

Construction of Ruhr and Hafenkanal Bridges and Demolition/Construction of Kaiserhafen Bridge/Dam

Beschaffer: Bundesministerium für Wirtschaft und Energie (BMWE), Beschafftungsdienstleister: Forschungszentrum Jülich GmbH, Projektträger Jülich (PtJ)·Karlsruhe, Germany·Deadline Dec 31, 2099 · 26816 days left·Open·Works
Originaltitel der Bekanntmachung

Germany-Duisburg: Bridge

20/100

Opportunity Score

Needs reviewHigh complexity
WorksOpen
Warum diese Bewertung?

Chance

20 / 100

Komplexität

85 / 100

Risikofaktoren

The strict turnover and reference requirements (€100M general turnover, specific steel bridge and piling references) ma...

The submission deadline is set to 2099-12-31, which is clearly a placeholder. The actual deadline may be much sooner or...

No procurement documents available

Tiefe Portfolioanalyse

Tiefe Analyse der Unternehmenspassung

Verwendet:

  • Description
  • Industries & Services
  • Capabilities
  • Market & Experience
  • Certifications

Überblick

Moderate opportunity

Wichtige Fakten

  • Works contract
  • 1 lot
  • Demolition of existing Kaiserhafen bridge
  • Construction of two new steel bridges (Ruhr and Hafenkanal) with spans >= 50m
Vollständige Zusammenfassung anzeigen

This is an open procedure for the demolition and construction of bridges and a dam in Duisburg, Germany, as part of the renewal of the Oberbürgermeister-Karl-Lehr-Brückenzug (2nd construction phase). The tender covers Lot 1 of Package 1, which includes the construction of the Ruhr and Hafenkanal bridges and a pre-assembly area, demolition of the Kaiserhafen bridge, and construction of the Kaiserhafen dam. The project is highly technical with strict eligibility criteria including high turnover and specific reference projects. The deadline is set far in the future (2099-12-31), likely a placeholder. The estimated value is not provided.

Risiken

The strict turnover and reference requirements (€100M general turnover, specific steel bridge and piling references) ma...

The submission deadline is set to 2099-12-31, which is clearly a placeholder. The actual deadline may be much sooner or...

No procurement documents available

Analyse kann unvollständig sein

Nur ein Teil der Vergabeunterlagen wurde analysiert. Weitere Anforderungen, Zertifikate oder Einreichungsdokumente können in den übrigen Unterlagen enthalten sein.

Wichtige Anforderungen

Technical

  • Professional liability insurance with minimum coverage of €10 million per claim for personal injury, property damage, and financial loss

Eligibility

  • Minimum annual general turnover of €100 million in the last 3 years
  • Minimum annual specific turnover of €30 million in comparable projects in the last 3 years

Zuschlagskriterien

Lot 1

Technical quality (30 points)30%Price (70 points) - inferred from two weightings provided70%

Auftraggeber

Lose (1)

Los 1

Construction of Ruhr and Hafenkanal Bridges and Demolition/Construction of Kaiserhafen Bridge/Dam

Construction of two new river bridges (Ruhr and Hafenkanal), a pre-assembly area, demolition of the Kaiserhafen bridge, and construction of the Kaiserhafen dam. Part of the renewal of the Oberbürgermeister-Karl-Lehr-Brückenzug, 2nd construction phase, Package 1.

Kategorie

Bridge

Zuschlagskriterien

Best price-quality ratio

Frist

Deadline Dec 31, 2099

Vergabedetails

Veröffentlichungsdatum
07 Apr 2019
Sprachen
German

Referenzmetadaten

Rechtsgrundlage
32014L0024

Referenz-IDs

Ausschreibungs-ID
161397-2019

Ähnliche Ausschreibungen